top of page
Search
  • Writer's pictureER Colorado NOW

7/23/21 Update Letter from Metro

We have received the following email from Metro regarding the status of the BRT that will run through Colorado Boulevard. Metro does not agree with conducting a cone study but instead are in favor of doing a simulation using a computer. This decision left the Eagle Rock community divided. Some think a demonstration cone study is designed to fail because it will only implement coning off one lane without timing the streets lights and actual buses running on the dedicated bus lane. There are others who think this simulation will not accurately emulate real life scenarios that occur along Colorado Blvd such as cars parallel parking or trying to make left turns, regular buses dropping off bus riders, trucks delivering goods to local businesses, and the rush hour traffic. Also, the simulation will not visually show the entire community the impending changes that will happen in the near future.




Metro-Update-Email-7-23-21
.pdf
Download PDF • 2.06MB

86 views0 comments

Recent Posts

See All

Resources, Sites for More Information

We are not affiliated with any of the following links or organizations. We are only seeking to inform the community about these possible changes that are to take place. ​ *Project Update 9/24/21 by Bo

bottom of page